Maintenance Building

Building Number: 0310
Building Code: MA
Assignable Square Feet: 13,077
Gross Square Feet: 15,392
Construction Year: 1976
Original Cost: $607,588
Replacement Cost: $3,572,000
Ground Breaking Date: July 1, 1975
Occupancy Date: March 1, 1976

The Maintenance Building, constructed of poured-in-place and precast concrete, houses the Department of Operations and Maintenance and includes offices, shops, and work areas for the trades. A major addition to the Maintenance Building known as the Storage Facility was completed in 1982 at a cost of $886,000 and includes 20,560 gross square feet. The Maintenance Building is a one-level building with a total size of 35,952 gross square feet.

 

Project Team:

Architect: Robert Ehmet Hayes & Associates 

Mechanical Engineer: Maxfield, Edwards & Backer P.S.C.

Structural Engineer:  American Engineering Company

General Contractor: Dugan & Meyers Construction Company

 

STORAGE FACILITY 1982:

Architect: Robert Ehmet Hayes & Associates 

Mechanical Engineer: Maxfield, Edwards & Backer P.S.C.

Structural Engineer:  THP Limited